Todd and di miller bought a plot of land in 2011 with the expectancy to renovate the contemporary residence that became there. But at some stage in the 2011 queensland floods the house became destroyed and this left them financially ruined as their insurance didn’t come close to protecting the full fee of the damage.

They repaired their home as fine they could during 2012 however they still dreamed of renovating the house. This changed into while todd dreamt up the idea of constructing a new residence out of Shipping containers instead of traditional building material; he knew this was the handiest way they may manage to pay for to construct the house they wanted. Todd stated in addition they chose to use containers because of the velocity they may be built with and because they may be environmentally pleasant.

1. Planning

Todd and di deliberate to apply 31 shipping containers to construct their four bedroomed, 6000 square foot domestic. The ground floor might be comprised of 10 transport shipping containers and could incorporate a double storage, gymnasium, domestic office, pool room and artwork studio; it’ll also be flood evidence. The second layer would be stacked with eleven shipping containers and function a colossal open plan living room/kitchen, bathroom, 3 bedrooms and a look at. The 0.33 ground can be built the usage of 10 extra containers and homes the master bedroom, stroll in cloth wardrobe, en-suite and a deck/terrace.

home plans australia floor plan case study houses floor plans grand house designs australia grand house designs australia plan

 

So the final product will feature a swimming pool, art studio, gym and four bedrooms. The total expected cost for all this… US$310,000 | AUD$400,000 | GBP£205,000 !! Di expects that the house will be built within 16 weeks.

At the end of 2012 Todd and Di applied for approval to build their home and the council accepted their proposal within six weeks. The council stipulated that under the new Queensland building regulations the ground floor needed to be flood proof; this is why using shipping containers was such a great choice because they are flood proof and require no additional modifications.

 

2. Build

Their first project was to buy the containers. Todd and di determined to buy present day containers aud$3,seven hundred every. The containers got here absolutely completed with 8 layers of paint at the outside and inside, cautious welding and 28mm marine plywood flooring. So in january 2013 the construction started!

1. Foundations

Their first assignment changed into to clear the website by using demolishing their old home and lay the foundations for their new one. For the rules todd drilled micropiles, nine meters deep into the floor and cement grout was used to ‘glue’ the piles to the encircling soil. Foundations like this can make their home cyclone proof. Concrete piers have been then laid on-top of the piles as a basis block to region the steel containers on. In total it took one month to clean the web page and entire the foundations.

2. Laying the shipping containers

Laying the containersin february todd took the first shipping of 10 bins. Each container turned into lifted into area and laid down on-pinnacle of the concrete piers. Within 4 hours the floor ground turned into whole and all that changed into left was to weld the containers together. Weeks later they took shipping of some other eleven shipping containers which could be used to create the primary floor of their domestic. This time however the shipping containers were located on-pinnacle of the floor ground and welded together. A similarly weeks later and the final 10 transport shipping containers had been brought to the site. They had been laid on-top of the first floor the use of a crane and the millers domestic turned into virtually starting to take form!

3. Sculpting the bins

The following step was to cut away at the metal shipping containers and form them into a home. To maintain the shipping containers’ integrity, thick universal metal beams were used inside the opening. For the home windows, tinted low-e glass become used to permit the recent air escape to during the summer season.

4. Interior

Once the home became watertight the subsequent step become to install the insulation and internal cladding. The second and 1/3 story outside partitions are all insulated with rockwool insulation sheets and held in region the usage of wooden battens. Once the insulation became finished plasterboard turned into positioned at the partitions and then a concrete coloured render was plastered over them. Di determined to hold the ceilings uncovered to reveal off the metallic!

It took 8 weeks from the first box being positioned until the constructing become water tight
The residence was then painted. Internally 3 layers of white dulux wash and wear have been used and externally 8 layers of dulux infracool had been used. Not only does the paint keep the coloration scheme regular during the house, the infracool paint used enables block uv rays and displays a number of the warmth away.

After the paint had dried todd fitted bamboo floors in the course of the house. In step with their eco aware design di and todd upcycled wooden, railway sleepers, glass, tasmanian all rightand many other materials at some stage in the build. They even mounted a grey water collector on their roof that’s used to flush their toilettes with.

All that became left now become for their kitchen to be outfitted and to transport in the indoors decorations.

5. Completing their home

In july 2013 their domestic became finished and geared up for them to transport in. The residence is noticeably robust and springs with a lifetime guarantee from its engineers. The millers say it is also cyclone proof and built to queensland’s state-of-the-art building guidelines for flood susceptible regions. It turned into the biggest container house in australian whilst it changed into built.
In overall their home fee aud$575,000 300,000 and took 24 weeks to construct. Todd explains that it value slightly extra than expected due to the fact they made numerous layout adjustments at some point of the development phase inclusive of adding a swimming pool, spending $40,000 on landscaping and building an extra rest room. But this extra expense proved worthwhile when they sold it on the cease of 2014 in excess folks$1,090,000 four hundred gbp£700,000.

Di and todd’s shipping field domestic has been featured on grand designs australia and i’ve included the video from their youtube channel.